The Marshalls Energy Company (MEC) now invites sealed Bids from eligible Bidders for; a. LOT 1 - Plant Design Supply and Installation of Power Station Upgrade and BESS, located in Majuro with an expected completion period of fourteen (14 months) and requiring refurbishment of the existing power station and supply and installation of a new battery energy storage system, to support new PV systems (LOT 2). b. LOT 2 Supply and Installation of Solar PV System and Associated Controls with a total capacity of 4.0MW at multiple sites on Majuro including system components of 2.6 MW floating PV systems on the Majuro Water Reservoirs, liners for reservoirs and rooftop PV systems at seven educational facilities. The systems are to be sufficiently sized to supply at least 7% of the RMI’s total energy consumption from renewable energy. Bidders bidding for both Lots will be evaluated on a Lot by Lot basis for all Financial and Experience criteria
|